Providing optimal solutions based on accumulated technology and experience.
Designed and fabricated for reliable performance, durability, and versatility in a wide range of marine environments.
Fish Cage Farms
Water Intake Pipelines
(Deep Seawater Intake, etc.)
PE Pontoons
Tendering, Technical Consultation & Design Following the tendering and technical consultation process, the installation site is reviewed and a project-specific design is developed.
BOM Preparation & Material Procurement A bill of materials (BOM) is prepared, and the required raw materials, components, and auxiliary materials are ordered and secured.
Receipt and Preparation of Government-Furnished Materials Government-furnished materials are received, cut to the specified dimensions, and sorted for fabrication and assembly.
Floating Pipe Assembly
(Assembly of Government-Furnished Materials)
The PE floating pipes are joined using heat-fusion welding.
Floating Pipe Bracket Installation (Assembly of Government-Furnished Materials) Support brackets are installed on the floating pipes to secure the upper deck structure.
Floating Pipe and Upper Deck Assembly (Assembly of Government-Furnished Materials) PE deck panels are installed at the designated locations on the floating pipes and support brackets.
Cross Bollard Installation Install mooring bitts on the upper deck to secure the vessel's mooring lines.
Transportation & Installation The assembled floating structure is transported to the installation site and installed in its designated position.
Mooring & Anchoring System Installation Anchors are set on the seabed and connected to the floating structure using chains and mooring lines to secure the structure in position.